Date Range
Date Range
Date Range
have been to the forefront of geotechnical engineering in Ireland and over the last 39 years it has firmly established itself as the Leading Piling and Foundations Specialist. Contiguous Bored Pile Retaining Walls. Secant Bored Pile Retaining Walls. PJ Edwards and Company Limited 2013.
A6 to Manchester Airport Relief Road. 3m diameter permanently cased piles adjacent to live railway. 880mm diameter Rotary Bored Contiguous Piled Wall out into the River Tay. 900mm diameter Rotary Bored piles drilled out in the River Medway. Bexhill to Hastings Link Road. 600mm to 1200mm diameter piles installed using both CFA and Bored and Cased Rotary techniques. A465 Heads of the Valleys Dualling.